REDDING, Shasta County — October 26, 2026. Property owners and contractors applying for building permits in Redding should prepare for a new upfront requirement. The city’s Building Division says a refundable construction-waste deposit became effective October 18, 2026, before building permits can be issued for several categories of work.

How much must applicants deposit?

Redding’s official building-permit guidance lists $500 for residential new construction, remodeling, repairs and demolition and $1,000 for commercial projects in the corresponding categories. The listed amounts are deposits intended to support construction-waste compliance, not flat charges that applicants necessarily lose.

Importantly, a construction-waste deposit is separate from the other permit fees, plan-review requirements, applicable taxes and contractor costs. Residents should obtain a current fee estimate for their particular project before beginning work.

How to qualify for a refund

According to the city, applicants seeking a refund must submit weight tickets from the Redding Transfer Station showing disposal of construction debris. Redding cites California Green Building Standards Code provisions for residential and nonresidential projects, including CALGreen sections 4.408.2 and 5.408.1.4.

A weight ticket documents waste handling; it is not a substitute for a completed inspection or compliance with separate recycling and diversion requirements. Owners should ask the Building Division when and how tickets must be submitted and what records contractors should retain.

Who should review this before scheduling work?

Homeowners planning a room addition, substantial remodel or demolition; commercial property owners commissioning tenant improvements; and builders preparing new construction should consider the deposit in project cash planning. Small work that does not require the relevant permit may be different, so the city must make a case-specific determination.

The Redding Permit Center is at 777 Cypress Avenue, first floor. The Building Division lists weekday public-counter hours of 8 a.m. to 3 p.m. Applicants should check for changes to those hours.

Official source and useful links

Primary source: City of Redding — Building Division: construction-waste deposits effective October 18, 2026. The same official page provides permit and inspection information.

Readers can also follow Redding News for utility, infrastructure and municipal updates, including the California58 network of local newspapers.

Editorial note: The amounts and rules cited above come from the city’s published October 2026 instructions. An individual applicant’s final fees and eligibility for a refund depend on the permit and documentation.

YOUR LOCAL NEWSPAPER NEEDS YOU

Help this community newspaper grow

Your support helps build coverage for the people and places this local newspaper serves.

Donate once by card ↗
Help Redding News grow Help strengthen reporting on Redding: community voices, important decisions and local life.
Support Redding News

Choose how to support Redding News:

Credit / Debit Card via Stripe

Choose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Redding News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
Optional support through the publisher. Contributions are not advertised as tax-deductible and never buy editorial influence.

Redding News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Redding News newsroom →

More from Redding News

Visit Redding News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.